| Sign In | Join Free | My chinalane.org |
|
Place of Origin : China
Brand Name : MR
Certification : CE,ROHS,UL,DLC, FCC, PSE
Model Number : MR-T8-150-22W(2835SMD) 154SMDs
MOQ : 50pcs
Price : negotiation
Packaging Details : Gift box
Delivery Time : 3-10 days
Payment Terms : FOB SHENZHEN
Supply Ability : 50000pcs/m
Item : T8 tube
power : 22watt
LED chip : SMD2835
material : aluminum+pc
Base : G13
High Power 22w T8 SMD LED Fluorescent Tube Aluminum 1.2m G13 2700 - 6500K
Note: Default option is 6000k and milky cover, if you need other type CCT/COVER, please leave an message when place an order.
Quick details:
Description:
1, Unique designed: Excellent heat dissipation
2, Particular inner design: makes the tubes with no shadow area
3, Elegant plastics end cap, nice and safe for human
4,Taiwan chip SMD3528;super brightness and low degradation make sure of long life span of LEDs
5, Ultra quality drivers and other electronical components extend the life of LED



Specifications:
| Item Type | UL/DLC LED Tube Lights |
| Model Number | MR-T8-150-22W(2835SMD) 154SMDs |
| Input Voltage(V) | AC85-277V |
| Lamp Power(W) | 22 |
| Lamp Luminous Efficiency (lm/w) | 130lm/w |
| CRI (Ra>) | 80 |
| Color Temperature(CCT) | 3000K,4000K,5000K,6000K |
| LEDs | 2835SMD |
| Size | D26 * L1198mm |
| Beam Angle | 120 degree |
| Working Temperature (°C) | -20 - 45 |
| Working Lifetime (Hour) | 50,000 |
| Lamp Body Material | PC & Aluminum |
| IP Rating | IP54 |
| Certification | DLC,UL, FCC,CE, RoHS, PSE |
| Place of Origin | Shenzhen, China (Mainland) |
| Brand Name | MR |
| Tube Type | T8 |
| End cap | G13,R17D,FA8; fixed and rotating end cap |
| PC lens | Clear, frosted, semi-frosted, Strip-clear |
| Replacement | 40W fluorescent lamp |
| Warranty(Years) | 3 |
| Sample price | $5-$8 |
| Packing | 132*39*29cm(40pcs)/132*58*29cm(60pcs) |
| PF | >0.95 |
| THD | <15% |
Payment Terms:
1. Samples: Bank TT, 100% payment in advance;
2. Bulk order: Bank TT, 30% deposit and balance 70% settled before shipment.
Delivery time:
1. Samples: 3-5 working days;
2. Bulk order: 7-15 working days.
Our Service:
1. Delivery in time;
2. Strict quality control system;
3. Promptly reply and solve on problems;
4. Strong production capacity;
5. Good after-sale service to remove your worries;
After-sale Service:
1. Quick reply on customers’ questions;
2. If anything goes wrong with the products’ quality, we will replace for you free and undertake the shipping cost.
3. Make you a happy ordering.
Shipping Method:
1. By Express: DHL, UPS, Fedex, a fast and safe way for shipping, normally 3-5 working days for delivery;
2. By Air: In some area, the shipping cost by air is more favorable than by Express; 5-7 days for delivery
3. By Sea: the most economic shipping method, but cost longer shipping time; large quantity, heavy and not urgent goods can choose this way.
4. Your shipping agent or forwarder.
Application:
Office Building, Hotel, Shopping Mall, Subway Railway station, Bus Station
Underground Parking, Factory, Home, Advertisement lighting and Decoration lighting and so on.
|
|
High Power 22w T8 SMD LED Fluorescent Tube Aluminum 1.2m G13 2700 - 6500K Images |